Prefab Bus Stop

In our Prefabricated Bus Stop Shelters, no welding is demanded and they tend to be developed at entangled areas, where power is not all accessible. While arranging and structuring, a planner's job is of incredible significance due to the diverse parts of the building that are created in the assembling office. The parts are amassed together at the building site. Along these lines, the arranging and planning of our Prefabricated Bus Stop Shelters ought to be done definitely to stay away from structures with wrong fittings. The meaning of "Building Green" plan, regarding our shelters and their development, is extremely basic.
Product Image (S S 56)

Stainless Steel PEB Bus Stand

Price: 400.00 - 1500.00 INR/Square Foot
  • Delivery Time:1 Months
  • Supply Ability:500 Per Month
Product Image (S S 50)

Prefabricated Bus Stop Shelters

Price: 400.00 - 1500.00 INR/Unit
  • Supply Ability:500 Per Day
  • Delivery Time:1 Week
Product Image (PBS - 12)

Prefabricated Bus Stand

Price: 1 INR/Square Foot
  • Supply Ability:500 Per Month
  • Delivery Time:60 Months
  • Roof Material:Steel
  • Floor Material:tiles
  • Wall Materials:Steel
  • Door:Five
X


We Mainly wants More inquiries from Major Dealing Area like Assam, Guwahati, Tripura, Mizoram, Manipur ...
Get in touch with us
RFQ Request For Quotation
Get Quotes For Your Buying Requirement. Tell Suppliers What You Need.
I agree to abide by all the Terms and Conditions of tradeindia.com